Gast Construction
(701) 235-3454
Menu
< Return to Athletic Facilities
The Hulbert Aquatic Center is a new state-of-the-art swimming facility with a 50-meter Olympic-sized competition pool. The new 45,000 sq.ft. addition, which includes the 50-meter pool, also contains stadium seating and a mezzanine for up to 1,100 spectators. There are large team lockers, coaches’ offices, and a large common area which also includes the administrative offices. The Hulbert Aquatic Center consisted of remodeling the existing L.E. Berger pool, which was turned into a lesson pool, and a large area for dry training. The existing locker rooms were also renovated to make it more convenient for the swimmers.
Select an image below to view it at full-size. Navigate through images with the on-screen controls.
Top ^